Well planning and drilling support
When drilling production wells, we are dealing with a fairly short (by the standards of the oil and gas industry) cycle, which includes selection and justification of targets, geosteering and post drilling model update. Right time application of modern computer models at all stages, from target selection to post drilling analysis and model update, has shown their highest efficiency at hundreds of wells where PetroTrace specialists participated in design and drilling support. We have developed an integrated workflow for cluster drilling design, optimization and support based on evergreen seismo-geological, geological. flow simulation and geomechanical models.
Optimal selection of drilling targets and risk mitigation
Integrated well planning

Well trajectory optimization based on information from the geological and geomechanical models.
Geosteering

Support of horizontal section drilling using synthetic logs, stratigraphic geosteering and control of the wellbore position in the seismic section.
Drilling monitoring

Real-time monitoring of the drilling process.